Gear Change Linkage - Installation
Make sure the gear change rod length is set correctly (see Gear Change Rod Setting).
- Locate the gear change clamp to the gear selector shaft, as noted for removal. Tighten the fixing to 9 Nm.
- Install gear change pedal to the gear change bracket and tighten the new pivot bolt to 22 Nm.
- If required, attach the upper ball joint to the transmission linkage.
- If required, attach the lower ball joint to the gear change pedal.
- Refit the wire clips to retain the ball joints. Ensure the wire clips locate correctly in the ball joints before rotating the clips to lock in place.
Ball joint
Wire clip